Notice is hereby given that to facilitate road works, the fast lane of Fanling Highway southbound from a point about 120 metres north of its junction with Ho Ka Yuen Footbridge to a point about 110 metres south of the same junction will be temporarily closed to all vehicular traffic from 05.30 a.m. on 17 April 2025 to 01.00 a.m. on 14 September 2025.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.
LEE Chung-yan, Angela Commissioner for Transport